In this month of March comply two years and eleven months of uninterrupted operation the two lime Slaker Preparation Systems, sold by CHEMCO Systems/ AGT Mining and installed by SNC Lavalin in the Efluent Plant of Caletones Foundry of CODELCO CHILE Div. El Teniente.
The January 15 passed, continuing with the politics of Chemco of being always attentive to the performance of the systems sold, we visit these Plants and we take advantage to converse with the Leader of the Unit Mr. Raúl Garay.
Mr. Garay works more than 30 years in CODELCO and he is since the installation of the systems, in the Start Up and has controlled until today the operation of these Plants.
We ask him about the operation of these Plants, after three years of uninterrupted operation. He answered us the following:
“We have not had failures of equipments and the systems in the time passed from the start up, and if someone asks me about these Plants, would tell be decided them for them, because they comply with everything that they told us and they offered"
Mr. Garay announced us its next retreat of Codelco, after 30 years of work. We take advantage of these lines, to desire to Mr. Garay success and happiness next to its family in this new phase of its life.